Thursday 23 February 2012

Walkway Continued


Made more segments of the walkway and exported them into the whitebox. The following screens demonstrate that the segments can seamlessly be placed together.

Wednesday 22 February 2012

Walkway

 The walkway of the hangar are designed to be modular for ease of placement of each segment and so that it is customisable.

Tuesday 14 February 2012

Concorde WIP undercarriage + making more interesting plans


The wheels are probably too detailed, but I could use them to generate some normals to bake onto a lower poly set of wheels.The pictures below are the references I used to help model the landing gear parts. Regrettably I couldn't get any references of the gear in smaller seperate parts so I had to imagine what they would look like as I tried to interperate how each bit behaves in the system.


Thursday 9 February 2012

Concorde - Jet engine

Several changes were made to the wings to allow for the accurate alignment of the jet engine. Used the photos from the Duxford trip to help out.

Wednesday 8 February 2012

Concorde

More work done on the Concorde, the wings were a bit tricky to model since they are slighly curved.


Thursday 2 February 2012

Whitebox Update





Added the various miscellaneous assets I made this week to the whitebox. Needed to widen the interior a bit to fit in the wall segments so it didn't feel so cramped.